Transportation Improvement Program

Project Status Updates: TennesseeMississippi

Legend: Completed    Current Phase
Donelson Farms Parkway Arlington | Capital

Year Started: 2012
PIN #: 118492.00
TIP #: TCSP-2012-01

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Under construction

I-40 at Airline Road Interchange (Roundabouts) Arlington | Capital

Year Started: 2020
PIN #: 132003.00
TIP #: STBG-M-2020-01

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: ROW underway

US-70/US-79/SR-1 Arlington | Capital

Year Started: 2020
PIN #: Not Assigned
TIP #: STBG-M-2020-02

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: The project is in PE-N phase

Arlington Tennis Center - Pedestrian Access Arlington | Ped and Bike

Year Started: 2026
PIN #: 126713.00
TIP #: STP-M-2009-04

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: NEPA underway

Tennis Center Pedestrian Access Arlington | Ped and Bike

Year Started: 2023
PIN #: Not Assigned
TIP #: STP-M-2009-04

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: NEPA underway


Milton Wilson Blvd. Resurfacing Arlington | Resurfacing

Year Started: 2026
PIN #: Not Assigned
TIP #: STP-M-2009-03

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Contract execution underway

Intersection at Airline Road and Arlington Trail Arlington | Signalization

Year Started: 2020
PIN #: 131079.00
TIP #: STP-M-2009-06

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Under Construction



Brother Boulevard Coordinated Signal System Bartlett | Other

Year Started: 2023
PIN #: 132895.00
TIP #: CMAQ-2023-01

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Design underway

ADA Improvements - Phase I Bartlett | Ped and Bike

Year Started: 2023
PIN #: 132970.00
TIP #: STP-M-2009-04

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Design underway

Fletcher Creek Greenway - Phase 3 Bartlett | Ped and Bike

Year Started: 2018
PIN #: 126787.00
TIP #: STP-M-2009-04

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Upcoming construction rebid




Fletcher Creek Greenway - Phase 4 Bartlett | Ped and Bike

Year Started: 2023
PIN #: 132885.00
TIP #: STP-M-2009-04

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Design Underway



Fletcher Creek Greenway - Phase 5 Bartlett | Ped and Bike

Year Started: 2026
PIN #: Not Assigned
TIP #: STP-M-2009-04

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes:

Billy Maher/Ellendale Road/Old Brownsville Road/St. Elmo Road Bartlett | Resurfacing

Year Started: 2020
PIN #: Not Assigned
TIP #: STP-M-2009-03

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: NEPA underway


Elmore Park Road, Elmore Road, and Brunswick Road Resurfacing Bartlett | Resurfacing

Year Started: 2023
PIN #: 132249.00
TIP #: STP-M-2009-03

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Design underway

Elmore Park/Elmore Road/Brunswick Road Bartlett | Resurfacing

Year Started: 2020
PIN #: 132249.00
TIP #: STP-M-2009-03

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: NEPA Underway


Kirby Whitten Resurfacing Project Bartlett | Resurfacing

Year Started: 2026
PIN #: Not Assigned
TIP #: STP-M-2009-03

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes:

St Elmo, Old Brownsville, Billy Maher, Ellendale Roads Resurfacing Bartlett | Resurfacing

Year Started: 2026
PIN #: 136035.00
TIP #: STP-M-2009-03

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: PE-NEPA underway

Bartlett ITS Upgrades and Expansion Bartlett | Signalization

Year Started: 2027
PIN #: Not Assigned
TIP #: STP-M-2009-06

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes:

Shelton Road Bridge - Wolf River Lateral J Collierville | Bridge

Year Started: 2020
PIN #: 130858.00
TIP #: STP-M-2014-12

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: ROW underway



Shelby Drive Collierville | Capital

Year Started: 2017
PIN #: 125568.00
TIP #: STBG-M-2017-02

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Under construction



SR-175 (Shelby Drive) Collierville | Capital

Year Started: 2017
PIN #: 126685.00
TIP #: STBG-M-2017-01

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: ROW process underway

SR-57 Widening Collierville | Capital

Year Started: 2014
PIN #: 120114.00
TIP #: STP-M-2014-01

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Under construction

Byhalia Road Coordinated Signal System Collierville | Other

Year Started: 2022
PIN #: 132968.00
TIP #: CMAQ-2023-01

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: ROW certification underway


Major Road Plan Update Collierville | Other

Year Started: 2020
PIN #: 130857.00
TIP #: STBG-M-2020-06

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Plan development in the process

Wolf River Greenway Extension Collierville | Ped and Bike

Year Started: 2023
PIN #: 134313.00
TIP #: STP-M-2009-04

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Design underway

Houston Levee Road/Shelton Road/Progress Road Collierville | Resurfacing

Year Started: 2020
PIN #: 130195.00
TIP #: STP-M-2009-03

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Under construction



Frank Road at Bray Station Intersection Improvements Collierville | Signalization

Year Started: 2026
PIN #: 137500.00
TIP #: STP-M-2009-06

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes:

Houston Levee at Shea Road Signal Collierville | Signalization

Year Started: 2026
PIN #: 137499.00
TIP #: STP-M-2009-06

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes:

Mast Arm Signal at the Intersection of Hwy 72 and Sycamore Rd Collierville | Signalization

Year Started: 2026
PIN #: 137550.00
TIP #: STP-M-2009-06

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes:

McVay Road Bridge Replacement Germantown | Bridge

Year Started: 2023
PIN #: Not Assigned
TIP #: STP-M-2014-12

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Consultant selected but not under contract yet

Poplar Avenue Culvert Replacement V Germantown | Bridge

Year Started: 2020
PIN #: 129992.00
TIP #: STP-M-2014-12

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Project being rebid

Poplar Avenue Culvert Replacement VI Germantown | Bridge

Year Started: 2023
PIN #: Not Assigned
TIP #: STP-M-2014-12

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: On Hold

Forest Hill Irene Road Germantown | Capital

Year Started: 2020
PIN #: 129993.00
TIP #: STBG-M-2020-03

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Design Underway

ITS & Signal Master Plan Germantown | Other

Year Started: 2026
PIN #: 137161
TIP #: STBG-M-2020-06

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: PE-NEPA underway

Pavement Management Software Germantown | Other

Year Started: 2023
PIN #: 134652.00
TIP #: STBG-M-2020-06

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Purchase in process

Germantown Trail Extension Germantown | Ped and Bike

Year Started: 2020
PIN #: 130118.00
TIP #: STP-M-2009-04

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Design Underway


Greenway Trail Extension Germantown | Ped and Bike

Year Started: 2026
PIN #: Not Assigned
TIP #: STP-M-2009-04

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes:

Lily Walk Linear Park Germantown | Ped and Bike

Year Started: 2020
PIN #: 130119.00
TIP #: STP-M-2009-04

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Received NTP to ROW



Farmington Boulevard/Forest Hill Irene Road Germantown | Resurfacing

Year Started: 2023
PIN #: 134661.00
TIP #: STP-M-2009-03

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: NEPA underway

Forest Hill-Irene Rd. Southern City Limits Resurfacing Germantown | Resurfacing

Year Started: 2026
PIN #: Not Assigned
TIP #: STP-M-2009-03

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: NEPA ongoing

Neshoba Road/Wolf River Boulevard Germantown | Resurfacing

Year Started: 2020
PIN #: 130005.00
TIP #: STP-M-2009-03

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Under construction



Wolf River Boulevard from Kimbrough to the City Limits Resurfacing Germantown | Resurfacing

Year Started: 2026
PIN #: 137410.00
TIP #: STP-M-2009-03

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: NEPA ongoing

Germantown Road/West Street and Poplar Pike/McVay Road Traffic Signal Upgrade Germantown | Signalization

Year Started: 2023
PIN #: 135867.00
TIP #: STP-M-2009-06

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: PE-NEPA ongoing

Poplar Avenue & Poplar Pike Signal Germantown | Signalization

Year Started: 2026
PIN #: 137409.00
TIP #: STP-M-2009-06

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes:

Poplar Avenue and Kimbrough Road Germantown | Signalization

Year Started: 2023
PIN #: 134651
TIP #: STP-M-2009-06

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Consultant selection underway

Poplar Avenue and Kimbrough Road Intersection Improvements Germantown | Signalization

Year Started: 2023
PIN #: 134651.00
TIP #: STP-M-2009-06

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: NEPA ongoing

Poplar Pike & Forest Hill Irene Road, Winchester Road & Forest Hill Irene Road, Germantown Road & Neshoba Road Germantown | Signalization

Year Started: 2020
PIN #: 130007.00
TIP #: STP-M-2009-06

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Railroad coordination underway

Signal Upgrades (Poplar Pike & Forest Hill Irene Road, Winchester Road & Forest Hill Irene Road, Germantown Road & Neshoba Road) Germantown | Signalization

Year Started: 2023
PIN #: 130007.00
TIP #: STP-M-2009-06

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: ROW underway

Wolf River Boulevard and Houston High School Germantown | Signalization

Year Started: 2020
PIN #: 130008.00
TIP #: STP-M-2009-06

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Construction underway



New Canada Road Lakeland | Capital

Year Started: 2006
PIN #: 107036.00
TIP #: STP-M-2006-01

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Under construction (Phase 1)



Pavement Management Software Lakeland | Other

Year Started: 2023
PIN #: 134588.00
TIP #: STBG-M-2020-06

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Program underway


Davies Plantation Road Bike/Pedestrian Improvements Lakeland | Ped and Bike

Year Started: 2023
PIN #: 133939.00
TIP #: STP-M-2009-04

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: ROW plan underway

Scotts Creek Greenway Lakeland | Ped and Bike

Year Started: 2023
PIN #: 135353.00
TIP #: STP-M-2009-04

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: NEPA document under TDOT review


Canada Road Resurfacing Hwy 64 to I-40 Lakeland | Resurfacing

Year Started: 2023
PIN #: 134350.00
TIP #: STP-M-2009-03

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: ROW underway


Seed Tick Road Roundabout Lakeland | Signalization

Year Started: 2023
PIN #: 134743.00
TIP #: STP-M-2009-06

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: ROW plan underway

Crosstown Corridor Connector MATA | Capital

Year Started: 2023
PIN #: Not Applicable
TIP #: RAISE-2023-02

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Coordination with TDOT to begin the project

Memphis Innovation Corridor MATA | Capital

Year Started: 2017
PIN #: Not Applicable
TIP #: 5309-2017-01

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Project scope undergoing revision

Memphis Innovation Corridor MATA | Other

Year Started: 2023
PIN #: Not Assigned
TIP #: 5309-2017-01

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: The project is on pause.

Route 19 Bus Stop Redesign MATA | Ped and Bike

Year Started: 2020
PIN #: Not Applicable
TIP #: STP-M-2009-04

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: On Hold

Graham and Sam Cooper Memphis | Bridge

Year Started: 2026
PIN #: Not Assigned
TIP #: STP-M-2014-12

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes:

Graham/High Point Terrace /White Station (Sam Cooper) Memphis | Bridge

Year Started: 2020
PIN #: Not Assigned
TIP #: STP-M-2014-12

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: On Hold

High Point Terrace and Sam Cooper Memphis | Bridge

Year Started: 2026
PIN #: Not Assigned
TIP #: STP-M-2014-12

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes:

Sam Cooper Bridges (Multiple Locations) Memphis | Bridge

Year Started: 2023
PIN #: 119544.00
TIP #: STP-M-2014-12

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes:

White Station and Sam Cooper Memphis | Bridge

Year Started: 2026
PIN #: Not Assigned
TIP #: STP-M-2014-12

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes:

Elvis Presley Boulevard Memphis | Capital

Year Started: 2010
PIN #: 113028.00/113028.01/113028.02/113028.03/113028.04
TIP #: ENH-2010-01

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Under construction (Phase 2 -Middle Section). Design underway for Phase 3 (Southern Section)



Holmes Road East Memphis | Capital

Year Started: 2006
PIN #: 108701.00;108701.01
TIP #: STP-M-2006-09

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Revised construction plans under review by TDOT


Holmes Road West Memphis | Capital

Year Started: 2002
PIN #: 107040.00
TIP #: STP-M-2002-14

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Pending NEPA re-evaluation approval.

Plough Boulevard Memphis | Capital

Year Started: 2006
PIN #: 102619.00
TIP #: STP-M-2006-04

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Design Underway

Poplar Avenue Complete Streets Memphis | Capital

Year Started: 2017
PIN #: 127040.00
TIP #: STBG-M-2017-05

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Design Underway

Shelby Drive Memphis | Capital

Year Started: 2017
PIN #: 127024.00
TIP #: STBG-M-2017-08

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: NEPA underway

Summer Avenue Memphis | Capital

Year Started: 2023
PIN #: NA
TIP #: STBG-M-2023-02

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: On Hold

Winchester/Perkins Interchange Memphis | Capital

Year Started: 2004
PIN #: 107290.00
TIP #: STP-M-2004-01

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: The project is in ROW, acquiring property/easements. NEPA reevaluation is required.


Chelsea-Hollywood Street Project Memphis | Other

Year Started: 2018
PIN #: 128214.00
TIP #: CMAQ-2023-01

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Design underway

Covington Pike Signal System Memphis | Other

Year Started: 2020
PIN #: 130765.00
TIP #: CMAQ-2023-01

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: ROW underway

Democrat Road Signal System Memphis | Other

Year Started: 2018
PIN #: 128216.00
TIP #: CMAQ-2023-01

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Under construction



Memphis New Traffic Signals Memphis | Other

Year Started: 2018
PIN #: 128215.00
TIP #: CMAQ-2023-01

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: The project is under construction.


Watkins-Presley On-Street Project (Memphis Better Streets Project) Memphis | Other

Year Started: 2018
PIN #: 128217.00
TIP #: CMAQ-2023-01

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: On Hold

Chelsea Avenue Greenline Memphis | Ped and Bike

Year Started: 2014
PIN #: 119935.00
TIP #: STP-M-2009-04

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: The ROW process and design are underway.

Chiswood Street Pedestrian Safety Memphis | Ped and Bike

Year Started: 2015
PIN #: 123157.00
TIP #: STP-M-2009-04

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Design underway

Hanley Elementary Memphis | Ped and Bike

Year Started: 2014
PIN #: 120070.00
TIP #: STP-M-2009-04

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Under construction

Jefferson Avenue Cycle Track Memphis | Ped and Bike

Year Started: 2014
PIN #: 121916.00
TIP #: STP-M-2009-04

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: NTP to ROW (past TIP cycle)

Macon Rd. - Mullins Station Rd. Sidewalks Memphis | Ped and Bike

Year Started: 2015
PIN #: 123156.00
TIP #: STP-M-2009-04

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Design underway

North Parkway Sidewalks Memphis | Ped and Bike

Year Started: 2026
PIN #: 122148.00
TIP #: STP-M-2009-04

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Design underway

Overton Park Cooper Street Entrance Memphis | Ped and Bike

Year Started: 2014
PIN #: 119936.00
TIP #: STP-M-2009-04

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: ROW plans under review.


Range Line Road Sidewalks Memphis | Ped and Bike

Year Started: 2014
PIN #: 120072.00
TIP #: STP-M-2009-04

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Awaiting NTP to construction


Shelby Farms Greenline Bridge Memphis | Ped and Bike

Year Started: 2014
PIN #: 119937.00
TIP #: STP-M-2009-04

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: ROW process underway.

Shelby Farms Greenline Midtown Connector Memphis | Ped and Bike

Year Started: 2021
PIN #: Not Assigned
TIP #: STP-M-2009-04

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: On Hold

STP Sidewalk Program Memphis | Ped and Bike

Year Started: 2014
PIN #: 118412.00
TIP #: STP-M-2009-04

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Project is in construction phase

Walking & Biking in Memphis (Wolf River Greenway Final Gaps) Memphis | Ped and Bike

Year Started: 2024
PIN #: Not Assigned
TIP #: STP-M-2009-04

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Contract execution underway

Westmont Sidewalks Memphis | Ped and Bike

Year Started: 2015
PIN #: 123158.00
TIP #: STP-M-2009-04

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Design underway



Wolf River Greenway - Phase 15 Memphis | Ped and Bike

Year Started: 2015
PIN #: 123310.00
TIP #: STP-M-2009-04

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Design underway

Channel Avenue Resurfacing Memphis | Resurfacing

Year Started: 2026
PIN #: Not Assigned
TIP #: STP-M-2009-03

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes:

Chelsea Avenue East, Chelsea Avenue West, Democrat Road, Norris Road/Mallory Avenue, Watkins Street & Kirby Parkway- Resurfacing Group 1 Memphis | Resurfacing

Year Started: 2026
PIN #: 137566.00
TIP #: STP-M-2009-03

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Contract Execution Underway

Harbor Avenue Resurfacing Memphis | Resurfacing

Year Started: 2017
PIN #: 127036.00
TIP #: STP-M-2009-03

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Project being closed out soon



Perkins Road Middle, Perkins Road/ Extd North, Perkins Road South, Raleigh-Millington Road - Resurfacing Group 2 Memphis | Resurfacing

Year Started: 2026
PIN #: 137564.00
TIP #: STP-M-2009-03

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Contract Execution Underway

Kerr at Elvis Presley/Chelsea at Springdale/Summer at Holmes/Crump at Fourth/Macon at Wells Station/Poplar at Belvedere/Crump at Florida/Mallory at Lauderdale/Quince at Colonial/Winchester at Air Park Memphis | Signalization

Year Started: 2023
PIN #: Not Assigned
TIP #: STP-M-2009-06

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: On Hold

Signal Projects Group 2 Memphis | Signalization

Year Started: 2014
PIN #: 119541.00;119541.01
TIP #: STP-M-2009-03

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: ROW process underway (past TIP cycle)

Signalization Group 4 Memphis | Signalization

Year Started: 2023
PIN #: 130332.00
TIP #: STP-M-2009-06

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: On Hold

Signalization Group 5 Memphis | Signalization

Year Started: 2023
PIN #: 130443.00
TIP #: STP-M-2009-06

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: On Hold

Signalization Group 6 Memphis | Signalization

Year Started: 2023
PIN #: 130335.00
TIP #: STP-M-2009-06

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: On Hold

Signalization Group 7 Memphis | Signalization

Year Started: 2023
PIN #: 130409.00
TIP #: STP-M-2009-06

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: On Hold

Wilkinsville Connector Road Millington | Capital

Year Started: 2023
PIN #: 134909.00
TIP #: STBG-M-2023-03

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Design underway

Navy Road ADA Improvements Millington | Ped and Bike

Year Started: 2023
PIN #: 130915.00
TIP #: STP-M-2009-04

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: NEPA underway



Navy Road ADA Improvements Millington | Ped and Bike

Year Started: 2026
PIN #: 130915.00
TIP #: STP-M-2009-04

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: ROW plans underway

Easley Street and Shelby Road Resurfacing Millington | Resurfacing

Year Started: 2020
PIN #: 130917.00
TIP #: STP-M-2009-03

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Design underway

Jack Huffman/Newport Resurfacing Millington | Resurfacing

Year Started: 2026
PIN #: Not Assigned
TIP #: STP-M-2009-03

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes:

Raleigh-Millington Road Millington | Resurfacing

Year Started: 2023
PIN #: 134257.00
TIP #: STP-M-2009-03

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: NEPA underway


Raleigh-Millington Road Millington | Resurfacing

Year Started: 2026
PIN #: Not Assigned
TIP #: STP-M-2009-03

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes:

Wilkinsville Road Millington | Resurfacing

Year Started: 2023
PIN #: 134255.00
TIP #: STP-M-2009-03

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: NEPA underway


Wilkinsville Road Resurfacing Millington | Resurfacing

Year Started: 2023
PIN #: 134255.00
TIP #: STP-M-2009-03

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: ROW underway

Big Creek Church Road and US 51 Signal Millington | Signalization

Year Started: 2023
PIN #: 134258.00
TIP #: STP-M-2009-06

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: ROW plan underway

Highway 51 at Big Creek Church Road Millington | Signalization

Year Started: 2023
PIN #: 134258.00
TIP #: STP-M-2009-06

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: NEPA underway


Millington ITS Upgrades Millington | Signalization

Year Started: 2026
PIN #: Not Assigned
TIP #: STP-M-2009-06

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes:

Oakland US-64 ITS Upgrades Oakland | Signalization

Year Started: 2022
PIN #: 131146.00
TIP #: STP-M-2009-06

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: NEPA underway

Bike Share: Installation and Promotion of Campus Smart Bike Share - UOFM Other | Other

Year Started: 2018
PIN #: 128218.00
TIP #: CMAQ-2023-01

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: On Hold

eBike Operations and Assistance - Explore Bike Share Other | Other

Year Started: 2022
PIN #: Not Assigned
TIP #: CMAQ-2023-01

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Ongoing program

SR 57 and SR 196 Intersection Improvements (Piperton) Other | Signalization

Year Started: 2026
PIN #: Not Assigned
TIP #: STP-M-2009-06

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes:

Hacks Cross Road Shelby County | Capital

Year Started: 2017
PIN #: 123349.00
TIP #: STBG-M-2017-07

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: ROW acquisition ongoing



Holmes Road Shelby County | Capital

Year Started: 2020
PIN #: 128098.00
TIP #: STBG-M-2020-04

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Design Underway

Houston Levee Road Widening Shelby County | Capital

Year Started: 2014
PIN #: 119864.00
TIP #: STP-M-2014-03

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Design plans under TDOT review


Macon Road Widening Shelby County | Capital

Year Started: 2014
PIN #: 119861.00
TIP #: STP-M-2014-06

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: ROW process underway (in past TIP cycle)

Walnut Grove Road Widening Shelby County | Capital

Year Started: 2014
PIN #: 119862.00
TIP #: STP-M-2014-04

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: ROW underway

Congestion Management Program Shelby County | Other

Year Started: 2016
PIN #: 123030.00
TIP #: CMAQ-2023-01

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Construction on pin 0.03 underway


Fast Charging Network and Fleet Conversion to Electric Vehicles Shelby County | Other

Year Started: 2023
PIN #: 135771.00 (Stations) 135774.00 (Fleet)
TIP #: CMAQ-2023-01

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Upcoming purchase of Fleet Vehicles



Memphis Area Rideshare Program Shelby County | Other

Year Started: 2022
PIN #: NA
TIP #: CMAQ-2023-01

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Ongoing program

America's River Crossing TDOT | Capital

Year Started: 2024
PIN #: 132733.00
TIP #: BIP-2024-01

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: ROW underway

Eliminating Barriers on North Watkins (ELBOW) TDOT | Capital

Year Started: 2023
PIN #: Not Assigned
TIP #: RAISE-2023-01

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Design underway


I-240 @ Airways Blvd (Reconstruct interchange) TDOT | Capital

Year Started: 2012
PIN #: 107913.00
TIP #: TN-IM-2012-01

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: In TDOT's 10-Year Plan - Construction FY27

I-240 Midtown (I-55 to I-40) TDOT | Capital

Year Started: 2002
PIN #: 100330.00
TIP #: NHS-2002-01

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: In ROW.

I-40 (1.0 mile east of Canada Road to SR-205 -Collierville-Arlington Road) TDOT | Capital

Year Started: 2006
PIN #: 110578.00
TIP #: NHS-2006-10-B

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: In TDOT's 10-Year Plan for Future Design

I-40 (Germantown Road to 1.0 mile east of Canada Road) TDOT | Capital

Year Started: 2006
PIN #: 107532.00
TIP #: NHS-2006-10-A

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: In TDOT's 10-Year Plan Future Design

I-69 (0.5 Mile North of Woodstock‐Cuba Road to State Route 385 - Future I-269) TDOT | Capital

Year Started: 2006
PIN #: Not Assigned
TIP #: NHS-2006-05

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: on Hold

I-69 (0.8 mile east of U.S.-51 to 0.5 miles south of SR-388) TDOT | Capital

Year Started: 2006
PIN #: 100328.01
TIP #: NHS-2006-03

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: on Hold

I-69 (South of Fite Road to 0.5 Miles North of Woodstock‐Cuba Road) TDOT | Capital

Year Started: 2008
PIN #: 100328.05
TIP #: NHS-2008-03-A

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: on Hold

I-69 (South of Shelby Road to North of Simmons Road) TDOT | Capital

Year Started: 2008
PIN #: Not Assigned
TIP #: NHS-2008-03-B

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: on Hold

I-69 (south of SR-388 to South of Fite Road) TDOT | Capital

Year Started: 2006
PIN #: 100328.02
TIP #: NHS-2006-04

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: on Hold

SR-1/Summer Ave (Sycamore View Road to Elmore Road) TDOT | Capital

Year Started: 1999
PIN #: 101609.02
TIP #: 79-012

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Waiting on Construction funds, all phases complete

SR-1/Summer Avenue (Near I-40 to 0.1 mile north of Sycamore View Road) TDOT | Capital

Year Started: 1999
PIN #: 101609.01
TIP #: TN-NHPP-2020-01

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Under construction



SR-14 (East of Kerrville-Rosemark Road to Tipton County Line TDOT | Capital

Year Started: 2002
PIN #: 100341.01
TIP #: TN-STBG-2023-01

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Under construction

SR-4 Widening TDOT | Capital

Year Started: 2018
PIN #: 100340.00
TIP #: TN-NHPP-2019-01

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Project scheduled for construction

SR-4/Lamar Avenue (South of Shelby Drive to Near Raines/Perkins Interchange) TDOT | Capital

Year Started: 2000
PIN #: 100339.02
TIP #: TN-NHPP-2018-01

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Under construction

US-78/Lamar Ave (Raines Road/Perkins Road Interchange to SR-176 (Getwell Road)) TDOT | Capital

Year Started: 2002
PIN #: 100340.00
TIP #: TN-NHPP-2019-01

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: In ROW.

Elvis Presley Boulevard Pedestrian Access Program TDOT | Other

Year Started: 2022
PIN #: 132650.00
TIP #: CMAQ-2023-01

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: On Hold

SR-3/US-51 ITS Expansion TDOT | Other

Year Started: 2022
PIN #: Not Assigned
TIP #: CMAQ-2023-01

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Railroad coordination underway


I-269 (ITS Expansion) TDOT | Signalization

Year Started: 2020
PIN #: 124755.00
TIP #: TN-STBG-2020-01

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: on Hold

SR-385 (ITS Expansion) TDOT | Signalization

Year Started: 2019
PIN #: 124759.00
TIP #: TN-NHPP-2019-02

Status:

Contract Execution
PE-NEPA
PE-Design
ROW/Utilities
CONST (Pre. Con)

Status Notes: Upcoming construction

General
Reminders

For additional project information, reference the current FY 2023-26 TIP document, which can be found on the FY 2023-26 TIP page.

For a map of the current TIP projects, visit the interactive web map.

The Project Status notes are a summary of the status of the project and are updated quarterly or as needed. For additional information please contact the Lead Agency or MPO staff.

For additional notes and information on how to use the Project Status Updates, visit the Overview page.

 

Go to the Top