Donelson Farms Parkway Arlington | Capital
Year Started: 2012
PIN #: 118492.00
TIP #: TCSP-2012-01
Status:
Status Notes: Under construction
I-40 at Airline Road Interchange (Roundabouts) Arlington | Capital
Year Started: 2020
PIN #: 132003.00
TIP #: STBG-M-2020-01
Status:
Status Notes: ROW underway
US-70/US-79/SR-1 Arlington | Capital
Year Started: 2020
PIN #: Not Assigned
TIP #: STBG-M-2020-02
Status:
Status Notes: The project is in PE-N phase
Arlington Tennis Center - Pedestrian Access Arlington | Ped and Bike
Year Started: 2026
PIN #: 126713.00
TIP #: STP-M-2009-04
Status:
Status Notes: NEPA underway
Tennis Center Pedestrian Access Arlington | Ped and Bike
Year Started: 2023
PIN #: Not Assigned
TIP #: STP-M-2009-04
Status:
Status Notes: NEPA underway
Milton Wilson Blvd. Resurfacing Arlington | Resurfacing
Year Started: 2026
PIN #: Not Assigned
TIP #: STP-M-2009-03
Status:
Status Notes: Contract execution underway
Intersection at Airline Road and Arlington Trail Arlington | Signalization
Year Started: 2020
PIN #: 131079.00
TIP #: STP-M-2009-06
Status:
Status Notes: Under Construction
Brother Boulevard Coordinated Signal System Bartlett | Other
Year Started: 2023
PIN #: 132895.00
TIP #: CMAQ-2023-01
Status:
Status Notes: Design underway
ADA Improvements - Phase I Bartlett | Ped and Bike
Year Started: 2023
PIN #: 132970.00
TIP #: STP-M-2009-04
Status:
Status Notes: Design underway
Fletcher Creek Greenway - Phase 3 Bartlett | Ped and Bike
Year Started: 2018
PIN #: 126787.00
TIP #: STP-M-2009-04
Status:
Status Notes: Upcoming construction rebid
Fletcher Creek Greenway - Phase 4 Bartlett | Ped and Bike
Year Started: 2023
PIN #: 132885.00
TIP #: STP-M-2009-04
Status:
Status Notes: Design Underway
Fletcher Creek Greenway - Phase 5 Bartlett | Ped and Bike
Year Started: 2026
PIN #: Not Assigned
TIP #: STP-M-2009-04
Status:
Status Notes:
Billy Maher/Ellendale Road/Old Brownsville Road/St. Elmo Road Bartlett | Resurfacing
Year Started: 2020
PIN #: Not Assigned
TIP #: STP-M-2009-03
Status:
Status Notes: NEPA underway
Elmore Park Road, Elmore Road, and Brunswick Road Resurfacing Bartlett | Resurfacing
Year Started: 2023
PIN #: 132249.00
TIP #: STP-M-2009-03
Status:
Status Notes: Design underway
Elmore Park/Elmore Road/Brunswick Road Bartlett | Resurfacing
Year Started: 2020
PIN #: 132249.00
TIP #: STP-M-2009-03
Status:
Status Notes: NEPA Underway
Kirby Whitten Resurfacing Project Bartlett | Resurfacing
Year Started: 2026
PIN #: Not Assigned
TIP #: STP-M-2009-03
Status:
Status Notes:
St Elmo, Old Brownsville, Billy Maher, Ellendale Roads Resurfacing Bartlett | Resurfacing
Year Started: 2026
PIN #: 136035.00
TIP #: STP-M-2009-03
Status:
Status Notes: PE-NEPA underway
Bartlett ITS Upgrades and Expansion Bartlett | Signalization
Year Started: 2027
PIN #: Not Assigned
TIP #: STP-M-2009-06
Status:
Status Notes:
Shelton Road Bridge - Wolf River Lateral J Collierville | Bridge
Year Started: 2020
PIN #: 130858.00
TIP #: STP-M-2014-12
Status:
Status Notes: ROW underway
Shelby Drive Collierville | Capital
Year Started: 2017
PIN #: 125568.00
TIP #: STBG-M-2017-02
Status:
Status Notes: Under construction
SR-175 (Shelby Drive) Collierville | Capital
Year Started: 2017
PIN #: 126685.00
TIP #: STBG-M-2017-01
Status:
Status Notes: ROW process underway
SR-57 Widening Collierville | Capital
Year Started: 2014
PIN #: 120114.00
TIP #: STP-M-2014-01
Status:
Status Notes: Under construction
Byhalia Road Coordinated Signal System Collierville | Other
Year Started: 2022
PIN #: 132968.00
TIP #: CMAQ-2023-01
Status:
Status Notes: ROW certification underway
Major Road Plan Update Collierville | Other
Year Started: 2020
PIN #: 130857.00
TIP #: STBG-M-2020-06
Status:
Status Notes: Plan development in the process
Wolf River Greenway Extension Collierville | Ped and Bike
Year Started: 2023
PIN #: 134313.00
TIP #: STP-M-2009-04
Status:
Status Notes: Design underway
Houston Levee Road/Shelton Road/Progress Road Collierville | Resurfacing
Year Started: 2020
PIN #: 130195.00
TIP #: STP-M-2009-03
Status:
Status Notes: Under construction
Frank Road at Bray Station Intersection Improvements Collierville | Signalization
Year Started: 2026
PIN #: 137500.00
TIP #: STP-M-2009-06
Status:
Status Notes:
Houston Levee at Shea Road Signal Collierville | Signalization
Year Started: 2026
PIN #: 137499.00
TIP #: STP-M-2009-06
Status:
Status Notes:
Mast Arm Signal at the Intersection of Hwy 72 and Sycamore Rd Collierville | Signalization
Year Started: 2026
PIN #: 137550.00
TIP #: STP-M-2009-06
Status:
Status Notes:
McVay Road Bridge Replacement Germantown | Bridge
Year Started: 2023
PIN #: Not Assigned
TIP #: STP-M-2014-12
Status:
Status Notes: Consultant selected but not under contract yet
Poplar Avenue Culvert Replacement V Germantown | Bridge
Year Started: 2020
PIN #: 129992.00
TIP #: STP-M-2014-12
Status:
Status Notes: Project being rebid
Poplar Avenue Culvert Replacement VI Germantown | Bridge
Year Started: 2023
PIN #: Not Assigned
TIP #: STP-M-2014-12
Status:
Status Notes: On Hold
Forest Hill Irene Road Germantown | Capital
Year Started: 2020
PIN #: 129993.00
TIP #: STBG-M-2020-03
Status:
Status Notes: Design Underway
ITS & Signal Master Plan Germantown | Other
Year Started: 2026
PIN #: 137161
TIP #: STBG-M-2020-06
Status:
Status Notes: PE-NEPA underway
Pavement Management Software Germantown | Other
Year Started: 2023
PIN #: 134652.00
TIP #: STBG-M-2020-06
Status:
Status Notes: Purchase in process
Germantown Trail Extension Germantown | Ped and Bike
Year Started: 2020
PIN #: 130118.00
TIP #: STP-M-2009-04
Status:
Status Notes: Design Underway
Greenway Trail Extension Germantown | Ped and Bike
Year Started: 2026
PIN #: Not Assigned
TIP #: STP-M-2009-04
Status:
Status Notes:
Lily Walk Linear Park Germantown | Ped and Bike
Year Started: 2020
PIN #: 130119.00
TIP #: STP-M-2009-04
Status:
Status Notes: Received NTP to ROW
Farmington Boulevard/Forest Hill Irene Road Germantown | Resurfacing
Year Started: 2023
PIN #: 134661.00
TIP #: STP-M-2009-03
Status:
Status Notes: NEPA underway
Forest Hill-Irene Rd. Southern City Limits Resurfacing Germantown | Resurfacing
Year Started: 2026
PIN #: Not Assigned
TIP #: STP-M-2009-03
Status:
Status Notes: NEPA ongoing
Neshoba Road/Wolf River Boulevard Germantown | Resurfacing
Year Started: 2020
PIN #: 130005.00
TIP #: STP-M-2009-03
Status:
Status Notes: Under construction
Wolf River Boulevard from Kimbrough to the City Limits Resurfacing Germantown | Resurfacing
Year Started: 2026
PIN #: 137410.00
TIP #: STP-M-2009-03
Status:
Status Notes: NEPA ongoing
Germantown Road/West Street and Poplar Pike/McVay Road Traffic Signal Upgrade Germantown | Signalization
Year Started: 2023
PIN #: 135867.00
TIP #: STP-M-2009-06
Status:
Status Notes: PE-NEPA ongoing
Poplar Avenue & Poplar Pike Signal Germantown | Signalization
Year Started: 2026
PIN #: 137409.00
TIP #: STP-M-2009-06
Status:
Status Notes:
Poplar Avenue and Kimbrough Road Germantown | Signalization
Year Started: 2023
PIN #: 134651
TIP #: STP-M-2009-06
Status:
Status Notes: Consultant selection underway
Poplar Avenue and Kimbrough Road Intersection Improvements Germantown | Signalization
Year Started: 2023
PIN #: 134651.00
TIP #: STP-M-2009-06
Status:
Status Notes: NEPA ongoing
Poplar Pike & Forest Hill Irene Road, Winchester Road & Forest Hill Irene Road, Germantown Road & Neshoba Road Germantown | Signalization
Year Started: 2020
PIN #: 130007.00
TIP #: STP-M-2009-06
Status:
Status Notes: Railroad coordination underway
Signal Upgrades (Poplar Pike & Forest Hill Irene Road, Winchester Road & Forest Hill Irene Road, Germantown Road & Neshoba Road) Germantown | Signalization
Year Started: 2023
PIN #: 130007.00
TIP #: STP-M-2009-06
Status:
Status Notes: ROW underway
Wolf River Boulevard and Houston High School Germantown | Signalization
Year Started: 2020
PIN #: 130008.00
TIP #: STP-M-2009-06
Status:
Status Notes: Construction underway
New Canada Road Lakeland | Capital
Year Started: 2006
PIN #: 107036.00
TIP #: STP-M-2006-01
Status:
Status Notes: Under construction (Phase 1)
Pavement Management Software Lakeland | Other
Year Started: 2023
PIN #: 134588.00
TIP #: STBG-M-2020-06
Status:
Status Notes: Program underway
Davies Plantation Road Bike/Pedestrian Improvements Lakeland | Ped and Bike
Year Started: 2023
PIN #: 133939.00
TIP #: STP-M-2009-04
Status:
Status Notes: ROW plan underway
Scotts Creek Greenway Lakeland | Ped and Bike
Year Started: 2023
PIN #: 135353.00
TIP #: STP-M-2009-04
Status:
Status Notes: NEPA document under TDOT review
Canada Road Resurfacing Hwy 64 to I-40 Lakeland | Resurfacing
Year Started: 2023
PIN #: 134350.00
TIP #: STP-M-2009-03
Status:
Status Notes: ROW underway
Seed Tick Road Roundabout Lakeland | Signalization
Year Started: 2023
PIN #: 134743.00
TIP #: STP-M-2009-06
Status:
Status Notes: ROW plan underway
Crosstown Corridor Connector MATA | Capital
Year Started: 2023
PIN #: Not Applicable
TIP #: RAISE-2023-02
Status:
Status Notes: Coordination with TDOT to begin the project
Memphis Innovation Corridor MATA | Capital
Year Started: 2017
PIN #: Not Applicable
TIP #: 5309-2017-01
Status:
Status Notes: Project scope undergoing revision
Memphis Innovation Corridor MATA | Other
Year Started: 2023
PIN #: Not Assigned
TIP #: 5309-2017-01
Status:
Status Notes: The project is on pause.
Route 19 Bus Stop Redesign MATA | Ped and Bike
Year Started: 2020
PIN #: Not Applicable
TIP #: STP-M-2009-04
Status:
Status Notes: On Hold
Graham and Sam Cooper Memphis | Bridge
Year Started: 2026
PIN #: Not Assigned
TIP #: STP-M-2014-12
Status:
Status Notes:
Graham/High Point Terrace /White Station (Sam Cooper) Memphis | Bridge
Year Started: 2020
PIN #: Not Assigned
TIP #: STP-M-2014-12
Status:
Status Notes: On Hold
High Point Terrace and Sam Cooper Memphis | Bridge
Year Started: 2026
PIN #: Not Assigned
TIP #: STP-M-2014-12
Status:
Status Notes:
Sam Cooper Bridges (Multiple Locations) Memphis | Bridge
Year Started: 2023
PIN #: 119544.00
TIP #: STP-M-2014-12
Status:
Status Notes:
White Station and Sam Cooper Memphis | Bridge
Year Started: 2026
PIN #: Not Assigned
TIP #: STP-M-2014-12
Status:
Status Notes:
Elvis Presley Boulevard Memphis | Capital
Year Started: 2010
PIN #: 113028.00/113028.01/113028.02/113028.03/113028.04
TIP #: ENH-2010-01
Status:
Status Notes: Under construction (Phase 2 -Middle Section). Design underway for Phase 3 (Southern Section)
Holmes Road East Memphis | Capital
Year Started: 2006
PIN #: 108701.00;108701.01
TIP #: STP-M-2006-09
Status:
Status Notes: Revised construction plans under review by TDOT
Holmes Road West Memphis | Capital
Year Started: 2002
PIN #: 107040.00
TIP #: STP-M-2002-14
Status:
Status Notes: Pending NEPA re-evaluation approval.
Plough Boulevard Memphis | Capital
Year Started: 2006
PIN #: 102619.00
TIP #: STP-M-2006-04
Status:
Status Notes: Design Underway
Poplar Avenue Complete Streets Memphis | Capital
Year Started: 2017
PIN #: 127040.00
TIP #: STBG-M-2017-05
Status:
Status Notes: Design Underway
Shelby Drive Memphis | Capital
Year Started: 2017
PIN #: 127024.00
TIP #: STBG-M-2017-08
Status:
Status Notes: NEPA underway
Summer Avenue Memphis | Capital
Year Started: 2023
PIN #: NA
TIP #: STBG-M-2023-02
Status:
Status Notes: On Hold
Winchester/Perkins Interchange Memphis | Capital
Year Started: 2004
PIN #: 107290.00
TIP #: STP-M-2004-01
Status:
Status Notes: The project is in ROW, acquiring property/easements. NEPA reevaluation is required.
Chelsea-Hollywood Street Project Memphis | Other
Year Started: 2018
PIN #: 128214.00
TIP #: CMAQ-2023-01
Status:
Status Notes: Design underway
Covington Pike Signal System Memphis | Other
Year Started: 2020
PIN #: 130765.00
TIP #: CMAQ-2023-01
Status:
Status Notes: ROW underway
Democrat Road Signal System Memphis | Other
Year Started: 2018
PIN #: 128216.00
TIP #: CMAQ-2023-01
Status:
Status Notes: Under construction
Memphis New Traffic Signals Memphis | Other
Year Started: 2018
PIN #: 128215.00
TIP #: CMAQ-2023-01
Status:
Status Notes: The project is under construction.
Watkins-Presley On-Street Project (Memphis Better Streets Project) Memphis | Other
Year Started: 2018
PIN #: 128217.00
TIP #: CMAQ-2023-01
Status:
Status Notes: On Hold
Chelsea Avenue Greenline Memphis | Ped and Bike
Year Started: 2014
PIN #: 119935.00
TIP #: STP-M-2009-04
Status:
Status Notes: The ROW process and design are underway.
Chiswood Street Pedestrian Safety Memphis | Ped and Bike
Year Started: 2015
PIN #: 123157.00
TIP #: STP-M-2009-04
Status:
Status Notes: Design underway
Hanley Elementary Memphis | Ped and Bike
Year Started: 2014
PIN #: 120070.00
TIP #: STP-M-2009-04
Status:
Status Notes: Under construction
Jefferson Avenue Cycle Track Memphis | Ped and Bike
Year Started: 2014
PIN #: 121916.00
TIP #: STP-M-2009-04
Status:
Status Notes: NTP to ROW (past TIP cycle)
Macon Rd. - Mullins Station Rd. Sidewalks Memphis | Ped and Bike
Year Started: 2015
PIN #: 123156.00
TIP #: STP-M-2009-04
Status:
Status Notes: Design underway
North Parkway Sidewalks Memphis | Ped and Bike
Year Started: 2026
PIN #: 122148.00
TIP #: STP-M-2009-04
Status:
Status Notes: Design underway
Overton Park Cooper Street Entrance Memphis | Ped and Bike
Year Started: 2014
PIN #: 119936.00
TIP #: STP-M-2009-04
Status:
Status Notes: ROW plans under review.
Range Line Road Sidewalks Memphis | Ped and Bike
Year Started: 2014
PIN #: 120072.00
TIP #: STP-M-2009-04
Status:
Status Notes: Awaiting NTP to construction
Shelby Farms Greenline Bridge Memphis | Ped and Bike
Year Started: 2014
PIN #: 119937.00
TIP #: STP-M-2009-04
Status:
Status Notes: ROW process underway.
Shelby Farms Greenline Midtown Connector Memphis | Ped and Bike
Year Started: 2021
PIN #: Not Assigned
TIP #: STP-M-2009-04
Status:
Status Notes: On Hold
STP Sidewalk Program Memphis | Ped and Bike
Year Started: 2014
PIN #: 118412.00
TIP #: STP-M-2009-04
Status:
Status Notes: Project is in construction phase
Walking & Biking in Memphis (Wolf River Greenway Final Gaps) Memphis | Ped and Bike
Year Started: 2024
PIN #: Not Assigned
TIP #: STP-M-2009-04
Status:
Status Notes: Contract execution underway
Westmont Sidewalks Memphis | Ped and Bike
Year Started: 2015
PIN #: 123158.00
TIP #: STP-M-2009-04
Status:
Status Notes: Design underway
Wolf River Greenway - Phase 15 Memphis | Ped and Bike
Year Started: 2015
PIN #: 123310.00
TIP #: STP-M-2009-04
Status:
Status Notes: Design underway
Channel Avenue Resurfacing Memphis | Resurfacing
Year Started: 2026
PIN #: Not Assigned
TIP #: STP-M-2009-03
Status:
Status Notes:
Chelsea Avenue East, Chelsea Avenue West, Democrat Road, Norris Road/Mallory Avenue, Watkins Street & Kirby Parkway- Resurfacing Group 1 Memphis | Resurfacing
Year Started: 2026
PIN #: 137566.00
TIP #: STP-M-2009-03
Status:
Status Notes: Contract Execution Underway
Harbor Avenue Resurfacing Memphis | Resurfacing
Year Started: 2017
PIN #: 127036.00
TIP #: STP-M-2009-03
Status:
Status Notes: Project being closed out soon
Perkins Road Middle, Perkins Road/ Extd North, Perkins Road South, Raleigh-Millington Road - Resurfacing Group 2 Memphis | Resurfacing
Year Started: 2026
PIN #: 137564.00
TIP #: STP-M-2009-03
Status:
Status Notes: Contract Execution Underway
Kerr at Elvis Presley/Chelsea at Springdale/Summer at Holmes/Crump at Fourth/Macon at Wells Station/Poplar at Belvedere/Crump at Florida/Mallory at Lauderdale/Quince at Colonial/Winchester at Air Park Memphis | Signalization
Year Started: 2023
PIN #: Not Assigned
TIP #: STP-M-2009-06
Status:
Status Notes: On Hold
Signal Projects Group 2 Memphis | Signalization
Year Started: 2014
PIN #: 119541.00;119541.01
TIP #: STP-M-2009-03
Status:
Status Notes: ROW process underway (past TIP cycle)
Signalization Group 4 Memphis | Signalization
Year Started: 2023
PIN #: 130332.00
TIP #: STP-M-2009-06
Status:
Status Notes: On Hold
Signalization Group 5 Memphis | Signalization
Year Started: 2023
PIN #: 130443.00
TIP #: STP-M-2009-06
Status:
Status Notes: On Hold
Signalization Group 6 Memphis | Signalization
Year Started: 2023
PIN #: 130335.00
TIP #: STP-M-2009-06
Status:
Status Notes: On Hold
Signalization Group 7 Memphis | Signalization
Year Started: 2023
PIN #: 130409.00
TIP #: STP-M-2009-06
Status:
Status Notes: On Hold
Wilkinsville Connector Road Millington | Capital
Year Started: 2023
PIN #: 134909.00
TIP #: STBG-M-2023-03
Status:
Status Notes: Design underway
Navy Road ADA Improvements Millington | Ped and Bike
Year Started: 2023
PIN #: 130915.00
TIP #: STP-M-2009-04
Status:
Status Notes: NEPA underway
Navy Road ADA Improvements Millington | Ped and Bike
Year Started: 2026
PIN #: 130915.00
TIP #: STP-M-2009-04
Status:
Status Notes: ROW plans underway
Easley Street and Shelby Road Resurfacing Millington | Resurfacing
Year Started: 2020
PIN #: 130917.00
TIP #: STP-M-2009-03
Status:
Status Notes: Design underway
Jack Huffman/Newport Resurfacing Millington | Resurfacing
Year Started: 2026
PIN #: Not Assigned
TIP #: STP-M-2009-03
Status:
Status Notes:
Raleigh-Millington Road Millington | Resurfacing
Year Started: 2023
PIN #: 134257.00
TIP #: STP-M-2009-03
Status:
Status Notes: NEPA underway
Raleigh-Millington Road Millington | Resurfacing
Year Started: 2026
PIN #: Not Assigned
TIP #: STP-M-2009-03
Status:
Status Notes:
Wilkinsville Road Millington | Resurfacing
Year Started: 2023
PIN #: 134255.00
TIP #: STP-M-2009-03
Status:
Status Notes: NEPA underway
Wilkinsville Road Resurfacing Millington | Resurfacing
Year Started: 2023
PIN #: 134255.00
TIP #: STP-M-2009-03
Status:
Status Notes: ROW underway
Big Creek Church Road and US 51 Signal Millington | Signalization
Year Started: 2023
PIN #: 134258.00
TIP #: STP-M-2009-06
Status:
Status Notes: ROW plan underway
Highway 51 at Big Creek Church Road Millington | Signalization
Year Started: 2023
PIN #: 134258.00
TIP #: STP-M-2009-06
Status:
Status Notes: NEPA underway
Millington ITS Upgrades Millington | Signalization
Year Started: 2026
PIN #: Not Assigned
TIP #: STP-M-2009-06
Status:
Status Notes:
Oakland US-64 ITS Upgrades Oakland | Signalization
Year Started: 2022
PIN #: 131146.00
TIP #: STP-M-2009-06
Status:
Status Notes: NEPA underway
Bike Share: Installation and Promotion of Campus Smart Bike Share - UOFM Other | Other
Year Started: 2018
PIN #: 128218.00
TIP #: CMAQ-2023-01
Status:
Status Notes: On Hold
eBike Operations and Assistance - Explore Bike Share Other | Other
Year Started: 2022
PIN #: Not Assigned
TIP #: CMAQ-2023-01
Status:
Status Notes: Ongoing program
SR 57 and SR 196 Intersection Improvements (Piperton) Other | Signalization
Year Started: 2026
PIN #: Not Assigned
TIP #: STP-M-2009-06
Status:
Status Notes:
Hacks Cross Road Shelby County | Capital
Year Started: 2017
PIN #: 123349.00
TIP #: STBG-M-2017-07
Status:
Status Notes: ROW acquisition ongoing
Holmes Road Shelby County | Capital
Year Started: 2020
PIN #: 128098.00
TIP #: STBG-M-2020-04
Status:
Status Notes: Design Underway
Houston Levee Road Widening Shelby County | Capital
Year Started: 2014
PIN #: 119864.00
TIP #: STP-M-2014-03
Status:
Status Notes: Design plans under TDOT review
Macon Road Widening Shelby County | Capital
Year Started: 2014
PIN #: 119861.00
TIP #: STP-M-2014-06
Status:
Status Notes: ROW process underway (in past TIP cycle)
Walnut Grove Road Widening Shelby County | Capital
Year Started: 2014
PIN #: 119862.00
TIP #: STP-M-2014-04
Status:
Status Notes: ROW underway
Congestion Management Program Shelby County | Other
Year Started: 2016
PIN #: 123030.00
TIP #: CMAQ-2023-01
Status:
Status Notes: Construction on pin 0.03 underway
Fast Charging Network and Fleet Conversion to Electric Vehicles Shelby County | Other
Year Started: 2023
PIN #: 135771.00 (Stations) 135774.00 (Fleet)
TIP #: CMAQ-2023-01
Status:
Status Notes: Upcoming purchase of Fleet Vehicles
Memphis Area Rideshare Program Shelby County | Other
Year Started: 2022
PIN #: NA
TIP #: CMAQ-2023-01
Status:
Status Notes: Ongoing program
America's River Crossing TDOT | Capital
Year Started: 2024
PIN #: 132733.00
TIP #: BIP-2024-01
Status:
Status Notes: ROW underway
Eliminating Barriers on North Watkins (ELBOW) TDOT | Capital
Year Started: 2023
PIN #: Not Assigned
TIP #: RAISE-2023-01
Status:
Status Notes: Design underway
I-240 @ Airways Blvd (Reconstruct interchange) TDOT | Capital
Year Started: 2012
PIN #: 107913.00
TIP #: TN-IM-2012-01
Status:
Status Notes: In TDOT's 10-Year Plan - Construction FY27
I-240 Midtown (I-55 to I-40) TDOT | Capital
Year Started: 2002
PIN #: 100330.00
TIP #: NHS-2002-01
Status:
Status Notes: In ROW.
I-40 (1.0 mile east of Canada Road to SR-205 -Collierville-Arlington Road) TDOT | Capital
Year Started: 2006
PIN #: 110578.00
TIP #: NHS-2006-10-B
Status:
Status Notes: In TDOT's 10-Year Plan for Future Design
I-40 (Germantown Road to 1.0 mile east of Canada Road) TDOT | Capital
Year Started: 2006
PIN #: 107532.00
TIP #: NHS-2006-10-A
Status:
Status Notes: In TDOT's 10-Year Plan Future Design
I-69 (0.5 Mile North of Woodstock‐Cuba Road to State Route 385 - Future I-269) TDOT | Capital
Year Started: 2006
PIN #: Not Assigned
TIP #: NHS-2006-05
Status:
Status Notes: on Hold
I-69 (0.8 mile east of U.S.-51 to 0.5 miles south of SR-388) TDOT | Capital
Year Started: 2006
PIN #: 100328.01
TIP #: NHS-2006-03
Status:
Status Notes: on Hold
I-69 (South of Fite Road to 0.5 Miles North of Woodstock‐Cuba Road) TDOT | Capital
Year Started: 2008
PIN #: 100328.05
TIP #: NHS-2008-03-A
Status:
Status Notes: on Hold
I-69 (South of Shelby Road to North of Simmons Road) TDOT | Capital
Year Started: 2008
PIN #: Not Assigned
TIP #: NHS-2008-03-B
Status:
Status Notes: on Hold
I-69 (south of SR-388 to South of Fite Road) TDOT | Capital
Year Started: 2006
PIN #: 100328.02
TIP #: NHS-2006-04
Status:
Status Notes: on Hold
SR-1/Summer Ave (Sycamore View Road to Elmore Road) TDOT | Capital
Year Started: 1999
PIN #: 101609.02
TIP #: 79-012
Status:
Status Notes: Waiting on Construction funds, all phases complete
SR-1/Summer Avenue (Near I-40 to 0.1 mile north of Sycamore View Road) TDOT | Capital
Year Started: 1999
PIN #: 101609.01
TIP #: TN-NHPP-2020-01
Status:
Status Notes: Under construction
SR-14 (East of Kerrville-Rosemark Road to Tipton County Line TDOT | Capital
Year Started: 2002
PIN #: 100341.01
TIP #: TN-STBG-2023-01
Status:
Status Notes: Under construction
SR-4 Widening TDOT | Capital
Year Started: 2018
PIN #: 100340.00
TIP #: TN-NHPP-2019-01
Status:
Status Notes: Project scheduled for construction
SR-4/Lamar Avenue (South of Shelby Drive to Near Raines/Perkins Interchange) TDOT | Capital
Year Started: 2000
PIN #: 100339.02
TIP #: TN-NHPP-2018-01
Status:
Status Notes: Under construction
US-78/Lamar Ave (Raines Road/Perkins Road Interchange to SR-176 (Getwell Road)) TDOT | Capital
Year Started: 2002
PIN #: 100340.00
TIP #: TN-NHPP-2019-01
Status:
Status Notes: In ROW.
Elvis Presley Boulevard Pedestrian Access Program TDOT | Other
Year Started: 2022
PIN #: 132650.00
TIP #: CMAQ-2023-01
Status:
Status Notes: On Hold
SR-3/US-51 ITS Expansion TDOT | Other
Year Started: 2022
PIN #: Not Assigned
TIP #: CMAQ-2023-01
Status:
Status Notes: Railroad coordination underway
I-269 (ITS Expansion) TDOT | Signalization
Year Started: 2020
PIN #: 124755.00
TIP #: TN-STBG-2020-01
Status:
Status Notes: on Hold
SR-385 (ITS Expansion) TDOT | Signalization
Year Started: 2019
PIN #: 124759.00
TIP #: TN-NHPP-2019-02
Status:
Status Notes: Upcoming construction